Wind Power Sale in Gujarat - Group Captive Scheme
Any energy consumer (Industrial / Commercial) can source electricity from the captive power plant, under Group Captive Scheme, as specified in The Electricity Rules, 2005, published by Ministry of Power and approved by DISCOM under Group Captive Scheme. Consumers are required to hold minimum 26% equity in the Wind project and should consume minimum 51% of power generated from the Wind Power.
The landed cost of Wind Power is lower than the cost of DISCOM. Electricity is wheeled to consumption point through existing DISCOM grid network. No infrastructure change is required in existing setup !!!!